Qingdao KXD Steel Structure Co., Ltd kxdandy@chinasteelstructure.cn 86--13853233236
Product Details
Place of Origin: CHINA
Brand Name: QINGDAO KXD
Certification: ISO
Model Number: KXDFY-10
Document: KXD STEEL STRUCTURE CO.,LTD...TD.pdf
Payment & Shipping Terms
Minimum Order Quantity: 600 SQM
Price: 40USD ~100 USD/SQM
Packaging Details: SEAWORTHY PACKING
Delivery Time: 30 WORKING DAYS
Payment Terms: L/C,T/T,Western Union
Supply Ability: 8000TONS PER MONTH
Structure Type: |
Frame |
Material Grade: |
Q235(ASTM G30), Q355(ASTM G50) |
Construction Time: |
Short |
Design Load: |
Wind, Snow, Seismic |
Insulation: |
Glass Wool, Rock Wool, PU |
Carbon Structural Steel: |
Q235/Q355 |
Keyword: |
Steel Structural Steel Frame Building |
Tolerance: |
±5% |
Energyefficiency: |
Energy-saving Lighting And HVAC Systems |
File Formats: |
Solid Works, Autocad(Dxf, Dwg), Pdf |
Specification: |
Custom |
Standard: |
GB |
Pitch Degree: |
10~30 Degree |
Surfacetreatment: |
Galvanized / Painted |
Building: |
Prefabricated Steel Structure |
Structure Type: |
Frame |
Material Grade: |
Q235(ASTM G30), Q355(ASTM G50) |
Construction Time: |
Short |
Design Load: |
Wind, Snow, Seismic |
Insulation: |
Glass Wool, Rock Wool, PU |
Carbon Structural Steel: |
Q235/Q355 |
Keyword: |
Steel Structural Steel Frame Building |
Tolerance: |
±5% |
Energyefficiency: |
Energy-saving Lighting And HVAC Systems |
File Formats: |
Solid Works, Autocad(Dxf, Dwg), Pdf |
Specification: |
Custom |
Standard: |
GB |
Pitch Degree: |
10~30 Degree |
Surfacetreatment: |
Galvanized / Painted |
Building: |
Prefabricated Steel Structure |
| Parameter | Specification Range |
|---|---|
| Span Width | 10m - 60m (customizable) |
| Length | Unlimited (modular extension) |
| Eave Height | 4m - 15m |
| Steel Grade | Q235 / Q355 / ASTM A36 / A572 |
| Surface Treatment | Painted / Hot-Dip Galvanized |
| Roof & Wall Options | Sandwich Panel / Steel Sheet |
| Wind Resistance | Up to 150 km/h (customizable) |
| Seismic Resistance | Up to 8-9 Grade |
| Design Standard | ISO, CE, ASTM, BS |
| Installation Time | 30%-50% faster than traditional build |